Baldwin Hall 8th Floor
Under Construction, 2000-2001

 Engineering Library and Information Commons
September, 2001


Windows between Circulation and Info Commons.

Library entrance.

Circulation desk.

Looking from Circulation into Info Commons.

Staff area.

Staff work room. Flooring being installed.

View from Reference Librarian's desk.

Windows around the former central staircase.

Looking down to 7th floor.

Looking out over Rhodes.

Windows in library classroom.

Inside the classroom.

The stack area at the south end.

Close-up of new lighting fixtures.

Lighting fixtures in main corridor.

Take a guess.

Equipment for sprinkler system! on Mezzanine.

Old library entrance - now entrance to Mural Room.

Computer classroom gets electricity and connectivity.

View from Librarian's desk.

Close-up of workroom flooring.

Front doors hung.

Carpet outside Library entrance.

Carpet inside library by Circulation.

Carpet around light shaft over central staircase.

Carpet by new classroom. Windows in.

Stack area at south end now carpeted.

New drinking fountain!

Circulation desk book drop.

dfb
9/24/01