Baldwin Hall 8th Floor
Under Construction, 2000-2001

 Engineering Library and Information Commons
April 17, 2001

Pictures arranged in general order as you enter north end by elevator in Rhodes Hall and proceed through north wing where the computer classrooms are and then south into library section.

Small computer lab at north end with earthquake reinforcement in wall.
 

Dorothy's office, looking north to Rieveschl.
 

Large computer lab in north wing, looking toward Quad.
 

Library entrance with circulation desk on left, facing south.
 

Staff area behind circulation desk, with windows facing east.

Back work area, for deliveries and processing.

Looking into Information Commons, facing west and north.

Reference Librarian office, facing Quad.  Shaft not closed yet.

Floor over center staircase.  Future site of Reference area.

Future glass shaft in the center stairwell to light 7th and 8th floors.

Copying area and group study room, east side past Reference.

Another group study room, further south on east side.

Electronic classroom across from group study areas, facing west.

Another earthquake wall at southeast end in future stack area.

Future stack area at sound end with view to stadium and TUC.

Ceiling detail.  Being replastered.
 

dfb
4/17/01